Get a new look with a revamping operation
Centre Ouest Céréales - Les Ormes (Vienne)
Centre Ouest Céréales had to decide whether or not to maintain a site located in the city centre and equipped with an old wooden silo from the 30s.
Relocating the facilities would have allowed for greater flexibility in the development of the handling and storage tool, but the decision was made to prioritize the existing site to preserve a strategic aspect of the system: a railway junction. This possibility of rapid loading of trains appeared fundamental. The reflection then focused on updating the site and improving its throughput.
At the beginning of 2015, the teams CERES Agro-industry were asked to produce a process diagram. This made it possible to simplify the circuits, double the reception capacity to 200 T/h and thus better adapt to the reduced harvest times, bring the silo dust extraction system up to standard and finally renovate the existing handling system by improving its flow rate.
90% of our clients' needs were met. The remaining 10% were not compatible with the nature of the site.
A series of plans were drawn up because the solutions were complex both technically and financially.
The budget study was completed in the summer of 2015. The project was updated in the fall of 2016 and the order was validated at the end of 2016. It is currently underway.
Centre Ouest Céréales has placed its trust in us for over 30 years.
Key information:
- Transition from handling to 200 t/h
- Additional 200 t/h receiving line
- Two 250m3 suction units
- 200 t/h bucket elevator
- 200 t/h chain conveyor